A selection of our recent projects, from structural work to finishing, across the Grand Est.

Structural renovation (structural works)

Metz

Underpinning and structural works within an existing building. Construction of a new concrete staircase and pouring of reinforced-concrete slabs, with placement of rebar and formwork in openings cut through the masonry walls. The structure is held by adjustable steel props during the works.

Baltec Innovation project — Metz 1
Baltec Innovation project — Metz 2
Baltec Innovation project — Metz 3
Baltec Innovation project — Metz 4
Baltec Innovation project — Metz 5
Baltec Innovation project — Metz 6
Baltec Innovation project — Metz 7
Baltec Innovation project — Metz 8
Baltec Innovation project — Metz 9
Baltec Innovation project — Metz 10
New build — structural works

Oberhausbergen

New-build project in the structural works phase, within a residential setting. Earthworks and shored excavations, construction of reinforced-concrete walls and slabs (formwork, props, rebar and starter bars), then the laying of fired-clay brick walls. The load-bearing structure is rising above the foundations.

Baltec Innovation project — Oberhausbergen 1
Baltec Innovation project — Oberhausbergen 2
Baltec Innovation project — Oberhausbergen 3
Baltec Innovation project — Oberhausbergen 4
Baltec Innovation project — Oberhausbergen 5
Baltec Innovation project — Oberhausbergen 6
Baltec Innovation project — Oberhausbergen 7
Baltec Innovation project — Oberhausbergen 8
Baltec Innovation project — Oberhausbergen 9
Baltec Innovation project — Oberhausbergen 10
Baltec Innovation project — Oberhausbergen 11
Baltec Innovation project — Oberhausbergen 12
Baltec Innovation project — Oberhausbergen 13
Baltec Innovation project — Oberhausbergen 14
Baltec Innovation project — Oberhausbergen 15
New build — structural works

Osthouse

New-build house in the structural (shell) phase. The walls are laid in hollow honeycomb clay blocks (single-leaf type) with reinforced-concrete floor slabs; a concrete staircase is cast in place in its timber formwork. Metal wall-form panels and props are on site, with the roof covering and renders still to be completed.

Baltec Innovation project — Osthouse 1
Baltec Innovation project — Osthouse 2
Baltec Innovation project — Osthouse 3
Baltec Innovation project — Osthouse 4
Baltec Innovation project — Osthouse 5
Baltec Innovation project — Osthouse 6
Baltec Innovation project — Osthouse 7
Baltec Innovation project — Osthouse 8
Baltec Innovation project — Osthouse 9
Baltec Innovation project — Osthouse 10
Baltec Innovation project — Osthouse 11
Baltec Innovation project — Osthouse 12
Baltec Innovation project — Osthouse 13
Baltec Innovation project — Osthouse 14
Baltec Innovation project — Osthouse 15
Baltec Innovation project — Osthouse 16
Baltec Innovation project — Osthouse 17
Baltec Innovation project — Osthouse 18
Baltec Innovation project — Osthouse 19
Baltec Innovation project — Osthouse 20
Baltec Innovation project — Osthouse 21
Baltec Innovation project — Osthouse 22
Baltec Innovation project — Osthouse 23
Baltec Innovation project — Osthouse 24
Baltec Innovation project — Osthouse 25
Baltec Innovation project — Osthouse 26
Baltec Innovation project — Osthouse 27
Baltec Innovation project — Osthouse 28